Oil well production tubing
Once the casing is run and cemented in place, the production tubing enters the well.
Oil pipe joints are connected together through joints to form a pipe string. Running tubing into an oil well is much the same as running casing, except that the tubing is smaller in diameter and removable.
The production string provides continuous drilling from the reservoir to the wellhead and, along with other components of the production string, produces oil and natural gas at the surface.
Unlike casing, production tubing is designed to be installed, removed and reinstalled quickly, efficiently and safely.
Producing oil and gas through tubing is also more efficient than producing through large diameter casing.
Specification
Below is a list of standard API5CT tubing specifications.
We are able to supply all API specifications of pipe as well as non-API specifications in special cases, including those with semi-premium and premium connections.
We have a portfolio of many common gauge pipes on the ground and can deliver these pipes quickly.
Please contact us to discuss your needs.
Specification | ||
Sizes | Outside Diameter (Inches) | Corresponding Poundage (Pounds Per Foot) |
1.050 | 1.14 PPF to 1.54 PPF | |
1.315 | 1.70 PPF to 2.24 PPF | |
1.660 | 2.09 PPF to 3.07 PPF | |
1.900 | 2.40 PPF to 5.15 PPF | |
2.063 | 3.24 PPF to 4.50 PPF | |
2-3/8 | 4.00 PPF to 7.45 PPF | |
2-7/8 | 6.40 PPF to 11.50 PPF | |
3-1/2 | 7.70 PPF to 17.00 PPF | |
4 | 9.50 PPF to 22.20 PPF | |
4-1/2 | 12.60 PPF to 26.10 PPF | |
Grades | H40, J55, N80, N80Q, L80, C90, C95, T95, P110, 13CR | |
Connections |
NUE (non-upset tubing), EUE (external upset tubing), IJ (integral joint tubing), |
|
Lengths | Range 1, Range 2 & Range 3 | |
Protection |
External Bare and Uncoated OR Externally Coated with Anti-Rust Mill Varnish Plastic OR Metal Pin and Box Protectors. Internal Plastic Coating OR Sleeves. |
|
Mill Test Certificates |
Issued in accordance with API Specification 5CT Eighth Edition. Third Party Inspection can be performed on request at buyer’s care and expense. |
Vida útil de las tuberías de acero de las calderas
Posted: Jul 21, 2025Introducción al recubrimiento de tuberías ERW
Posted: Jul 16, 2025Diferencias en el proceso de producción entre tubos sin costura y tubos para calderas
Posted: Jul 14, 2025Tubo de cobre-níquel 90/10
Posted: Jul 09, 2025Continental Steel Co.,Ltd(CSC) is a pioneering manufacturer, stockist, and supplier of steel pipe products.